Toronto, ON – July 16, 2024 – Champion Electric Metals Inc. (CSE: LTHM; OTCQB: GLDRF; FSE:
1QB0) (“Champion Electric” or the "Company") is pleased to confirm visually identified
spodumene-bearing pegmatite dikes exposed in excavator trenches at the Western Prospect of
the Quebec Lithium Project in the heart of the Eeyou Istchee James Bay territory (see Fig. 1).
As part of the 2024 field program, a series of excavator trenches has been completed at various
places across the recently reported 1,700-metre-long glacial dispersal train of spodumenebearing
boulders (see Fig. 2). Significantly, spodumene-bearing pegmatite dikes ranging from 3
to 17 metres width were exposed in 3 trenches in the vicinity of the mineralized pegmatite dike
intersected in drill hole EIQ24-007 (10.0 metres at 0.42% Li2O).
“It is gratifying to see that the design and execution of the 2023 exploration program provided
the foundation for the discovery of ‘blind’ mineralization so rapidly in 2024,” commented
President and CEO Jonathan Buick. “We now transition to identify areas along strike and at
depth with potential for increased thickness and lithium grade of these mineralized pegmatite
dikes. Simultaneously, we will advance target development across the length of the property.
We look forward to reporting exciting results from the upcoming drill program starting in about
two weeks.”
Highlights of the Exposed Spodumene-Bearing Pegmatite Dikes
The thickness of glacial sedimentary cover encountered in trenches ranges from one metre to
more than five metres, the maximum reach of the excavator. Once exposed, the bedrock surface
in the trenches tends to vary in depth, usually exposing only 10-20 metres at a time; and certain
of the trenches failed to reach any bedrock.
Please see link for drone footage of newly exposed spodumene-bearing pegmatite dikes:
https://youtu.be/JsG4TwZZJCY
Each of these mineralized pegmatite dikes was then explored along its strike to the limits of the
excavator to reach bedrock, typically a distance of 30-40 metres (see Fig. 3). The geological
team completed systematic mapping and channel sampling of pegmatite dikes with the aid of a
two-bladed diamond saw (see Fig 4). Channel sampling effectively approximates a “horizontal
drill hole”, which can be used to constrain the extent of the spodumene mineralized pegmatite
dikes by using the geological and sample data. This information will be used in the planning of
the pending diamond drill program. A total of 112 channel samples of nominal 1 metre length
has been shipped via commercial freight to Actlabs in Val d’Or, Quebec for analysis. Analytical
results are expected to be received in early August.
Visual estimates of spodumene content in pegmatite dike trench exposures range 2-10% with
significant variability recognized over short distances along strike. Spodumene crystals are pale
green in color with a maximum observed length of approx. 80 cm (see Figs. 4 and 5). Pegmatite
dikes typically exhibit fine-grained selvages of a few tens of centimetres width at their contacts
with amphibolite host rock; these selvages are absent of spodumene and are interpreted as chill
margins. Spodumene crystals can locally exhibit crude alignment that is suggestive of the flow
direction of the igneous melt.
These spodumene pegmatite dikes exposed in trenches are provisionally interpreted to correlate
to the mineralized dike intercept in drill hole EIQ24-007. A minimum strike length of 340 metres
is indicated for this pegmatite dike that remains open both to the northeast and southwest, and
at depth.
Overview of the 2024 Field Program:
The Company’s Quebec Lithium Project lies near notable lithium occurrences, such as Patriot
Battery Metals' Corvette Project and Winsome Resources' Cancet Discovery. Fieldwork for 2024
began northeast of the recent mineralized pegmatite discovery. Efforts include closely spaced
till sampling, boulder prospecting, mapping, trenching, and channel sampling with overburden
clearing at the new boulder field, where significant lithium results have been reported from
sampling.
Champion Electric invites shareholders, potential investors, and stakeholders to follow
the Company’s social media pages for ongoing photo updates of the spring field
program.
Facebook: ChampionLTHM
Twitter/X: @Championlthm
LinkedIn: championelectricmetals\
Sampling techniques and QA/QC
Under the supervision of senior staff, geologists collected samples from diamond saw-cut
channels in bedrock using rock hammer and chisel. The location for each series of contiguous
samples was recorded using a Trimble GPS instrument with 50 centimeter accuracy. Geologists
placed the samples in plastic bags which were then organized into larger rice bags to facilitate
transport to the lab. Certified standards and blanks were inserted at regular intervals as part of
the in-field QA/QC protocols. Champion geologists or contractors maintained secure custody of
the samples until transporting them to Activation Laboratories (“Actlabs”) in Val d’Or, Quebec for
sample preparation and analysis.
Qualified Person
Dr. Eric Hebert, P.Geo., Senior Geological consultant, is a member (#0842) of the Ordre des
Géologues du Québec (OGQ) and a qualified person within the meaning of National
Instrument43-101, and has reviewed and approved the technical information contained in this
press release.
* The Project is at an early stage of exploration, and the Company cautions that the qualified
persons who have reviewed and approved this news release have not verified scientific or
technical information produced by third parties.
Further, proximity to projects containing lithium resources offers no assurance that the rock types
or resources reported by Patriot Battery Metals, Winsome, and others will extend onto the
Project; nor should such proximity be assumed to imply similarity to mineralization and results
reported by other companies in the district.
About Champion Electric Metals Inc.
Champion Electric is a discovery-focused exploration company that is committed to advancing
its highly prospective lithium properties in Quebec, Canada and cobalt properties in Idaho,
United States. In addition, the Company owns the Baner gold project in Idaho County and the
Champagne polymetallic project in Butte County near Arco.
The Company’s shares trade on the CSE under the trading symbol “LTHM”, on the OTCQB
under the trading symbol “GLDRF”, and on the Frankfurt Stock Exchange under the symbol
“1QB0”. Champion Electric strives to be a responsible environmental steward, stakeholder and
contributing citizen to the local communities where it operates, taking its social license seriously,
employing local community members and service providers at its operations whenever possible.
ON BEHALF OF THE BOARD OF CHAMPION ELECTRIC
“Jonathan Buick”
Jonathan Buick, President and CEO
To learn more, please visit the Company’s SEDAR profile at www.sedar.com or the Company’s
corporate website at www.champem.com
For further information, please contact:
Investor Relations and Communications
Phone: (416) 567-9087
Email: investors@champem.com
Cautionary Statements
Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the
adequacy or accuracy of this press release. This press release may include forward-looking information within the meaning of
Canadian securities legislation, concerning the business of the Company. Forward-looking information is based on certain key
expectations and assumptions made by management of the Company, including closing of the Transactions and the prospectivity of
the Projects for lithium. Although the Company believes that the expectations and assumptions on which such forward-looking
information is based on are reasonable, undue reliance should not be placed on the forward-looking information because the
Company can give no assurance that they will prove to be correct. Forward-looking statements contained in this press release are
made as of the date of this press release. The Company disclaims any intent or obligation to update publicly any forward-looking
information, whether as a result of new information, future events or results or otherwise, other than as required by applicable
securities laws.
The Projects are at an early stage of exploration, and the Company cautions that the qualified persons who have reviewed and
approved this news release have not verified scientific or technical information produced by third parties